亚洲国产婷婷六月丁香,亚洲av永久中文无码精品 ,亚洲av成人精品一区二区三区,亚洲av无码乱码在线观看富二代,亚洲av乱码一区二区三区香蕉

Ansys和Matlab培訓(xùn)課程班

IBM Tivoli Monitoring 6.2.2 for Implementers培訓(xùn)課程-中心

5 (7942人評(píng)價(jià))
  • 精品
  • 筆記:(65387)

  • 學(xué)員:(97562)

  • 瀏覽:(237018)

  • 加入課程

課程介紹

 

其他精品熱門(mén)課程班: NI機(jī)器視覺(jué)編程培訓(xùn) Ansys CFD流體力學(xué)培訓(xùn)課程班 Sigrity仿真培訓(xùn)班 aspen-plus 培訓(xùn)班 ICEPAK培訓(xùn)班 Simulink自動(dòng)駕駛建模仿真培訓(xùn)班 電子產(chǎn)品可靠性設(shè)計(jì)(DFR)與失效分析(FA)培訓(xùn)班 SmartPlant3DDesign(SP3D設(shè)計(jì))培訓(xùn) 管道應(yīng)力分析軟件培訓(xùn)班 汽車(chē)輕量化車(chē)身結(jié)構(gòu)設(shè)計(jì)與碰撞仿真基礎(chǔ)技術(shù)培訓(xùn)班 SPEOS培訓(xùn)班DSP培訓(xùn)班R語(yǔ)言臨床試驗(yàn)數(shù)據(jù)實(shí)戰(zhàn)培訓(xùn)課程 Android Framework & HAL軟硬整合技術(shù)班 SPSS課程 icepak課程 ANSYS課程 疲勞分析培訓(xùn) 可靠性分析培訓(xùn)班 fluent課程班 DSP培訓(xùn)班班 CFD在建筑/環(huán)境領(lǐng)域的應(yīng)用培訓(xùn) PDPS仿真培訓(xùn)課程班(Tecnomatix Process Designer & Simulate培訓(xùn)) LACS培訓(xùn) FLOW培訓(xùn) 培訓(xùn)dsp Labview課程 SPSS培訓(xùn) Indesign培訓(xùn) Flotherm培訓(xùn) 培訓(xùn)Labview 虛擬實(shí)驗(yàn)室培訓(xùn) 培訓(xùn)虛擬實(shí)驗(yàn)室 Labview培訓(xùn) 培訓(xùn)虛擬實(shí)驗(yàn)室課程 Labview培訓(xùn)機(jī)構(gòu) 培訓(xùn)Abaqus 培訓(xùn)有限元 Flexsim培訓(xùn)
 
 

曙海教學(xué)優(yōu)勢(shì)

  本課程,秉承二十一年積累的教學(xué)品質(zhì),以項(xiàng)目實(shí)現(xiàn)為導(dǎo)向,面向企事業(yè)項(xiàng)目實(shí)際需要,老師將會(huì)與您分享設(shè)計(jì)的全流程以及工具的綜合使用經(jīng)驗(yàn)、技巧。課程可定制,線上/線下/上門(mén)皆可,熱線:4008699035。

  曙海培訓(xùn)的課程培養(yǎng)了大批受企業(yè)歡迎的工程師。大批企業(yè)和曙海
建立了良好的合作關(guān)系,合作企業(yè)30萬(wàn)+。曙海培訓(xùn)的課程在業(yè)內(nèi)有著響亮的知名度。

 

最新課程列表

  • IBM Tivoli Monitoring 6.2.2 for Implementers培訓(xùn)課程
    ?
    授課對(duì)象
    This intermediate course is for implementers responsible for installing, configuring, and performing the initial deployment of ITM. Administrators and deployment specialists will also benefit from this course.
    課程目標(biāo)
    • Plan an ITM 6.2.2 implementation
    • Install IBM Tivoli Monitoring 6.2.2 servers and their prerequisites
    • Configure and maintain ITM Tivoli Monitoring 6.2.2.
    • Install and configure Tivoli Enterprise Monitoring Agents
    • Install and configure event synchronization with Netcool/OMNIbus
    • Configure and verify availability for IBM Tivoli Monitoring
    • Describe how to implement ITM 6.2.2 user security and infrastructure component communication security
    主要課題
    Planning an ITM Implementation
    • Components
    • Design Process
    • Deployment and Availability
    • Preparing for the Installation
    • Upgrading
    Installing the IBM Tivoli Monitoring Infrastructure
    • Preparing for Installation
    • Installation Overview
    • Installing Server Components
    • Post-Installation and Problem Determination
    Configuring and Maintaining IBM Tivoli Monitoring
    • Working with ITM components
    • Data Backup and Restore
    • Maintenance
    Agents
    • Introduction to installing and Configuring Agents
    • Remote Installation
    • Installing ITM Agents Using the Command Line
    • Instaling IBM Tivoli Monitoring for Databases
    • Using TEP to Manage Agents
    Integratied Event Management
    • Overview of Integration Event Management
    • Netcool/OMNIbus Integration
    Configuring Availability In IBM Tivoli Monitoring
    • Resiliency and High Availability
    • Clustering
    • Heartbeats
    • Hot Standby Overview
    • TEMA and Remote TEMS Failover
    • TEPS in the Failover Scenario
    • Troubleshooting Availability
    Security
    • User Authentication
    • Infrastructure Component Communication Security
    • IP.PIPE connectivity
    • Firewall Considerations
    • Additional Security Topics



  • 咨詢(xún)?cè)诰€客服